- Upgrade fuzz container to Go 1.18.
- Upgrade worker to Go 1.18.
- The mod replace in tests/fuzz was pointing to the wrong controller.
Signed-off-by: Paulo Gomes <paulo.gomes@weave.works>
Running all CI tests at pull requests for some files is sub-optimal,
when a PR contain changes to a single file not checked by the tests.
Signed-off-by: Paulo Gomes <paulo.gomes@weave.works>