# Releasing knative/pkg
|
||||
|
||||
We release the components of Knative every 6 weeks. All of these components must
|
||||
be moved to the latest "release" of the knative/pkg shared library prior to each
|
||||
release, but likely this should happen incrementally over each milestone.
|
||||
|
||||
## Release Process.
|
||||
|
||||
### Step #1: Monday the week prior to each release.
|
||||
|
||||
On Monday of the week prior to the Knative release, each of the downstream
|
||||
repositories should stage a `[WIP]` Pull Request that advances the knative/pkg
|
||||
dependency to the latest commit.
|
||||
|
||||
At present, these downstream repositories include:
|
||||
|
||||
1. knative/serving
|
||||
1. knative/eventing
|
||||
1. knative/eventing-contrib
|
||||
1. knative/build
|
||||
1. knative/sample-controller
|
||||
1. GoogleCloudPlatform/cloud-run-events
|
||||
|
||||
> The automation that auto-bumps these lives [here](https://github.com/mattmoor/knobots/tree/knative/cmd/periodic/kodata).
|
||||
|
||||
`Gopkg.toml` should look like:
|
||||
|
||||
```toml
|
||||
[[override]]
|
||||
name = "github.com/knative/pkg"
|
||||
branch = "master"
|
||||
```
|
||||
|
||||
Then the following is run:
|
||||
|
||||
```shell
|
||||
dep ensure -update github.com/knative/pkg
|
||||
./hack/update-codegen.sh
|
||||
```
|
||||
|
||||
If problems are found, they are addressed and the update is merged, and this
|
||||
process repeats until knative/pkg can be cleanly updated without any changes.
|
||||
|
||||
> If by mid-week, we do not have a clean PR in each repository, the person
|
||||
> driving the update should escalate to avoid delaying the release.
|
||||
|
||||
|
||||
### Step #2: Friday the week prior to each release.
|
||||
|
||||
A release branch is snapped on knative/pkg with the form `release-0.X` where `X`
|
||||
reflects the forthcoming Knative release. The commit at which this branch is
|
||||
snapped will be the version that has been staged into `[WIP]` PRs in every
|
||||
repository.
|
||||
|
||||
These staging PRs are then updated to:
|
||||
|
||||
```toml
|
||||
[[override]]
|
||||
name = "github.com/knative/pkg"
|
||||
# The 0.X release branch.
|
||||
branch = "release-0.X"
|
||||
```
|
||||
|
||||
The `[WIP]` is removed, and the PRs are reviewed and merged.
|
||||
|
||||
|
||||
## Backporting Fixes
|
||||
|
||||
If a problem is found in knative/pkg in an older release and a fix must be
|
||||
backported then it should first be fixed at HEAD (if still relevant). It should
|
||||
be called out and likely discussed (with a lead) in the original PR whether the
|
||||
fix is desired and eligible for back-porting to a release branch. This may
|
||||
raise the review bar, or lead to trade-offs in design; it is better to
|
||||
front-load this consideration to avoid delaying a cherry-pick.
|
||||
|
||||
Once that PR has merged (if still relevant), the same commit should be
|
||||
cherry-picked onto `release-0.Y` and any merge problems fixed up.
|
||||
|
||||
Once the change is ready, a PR should be sent against `release-0.Y` with the
|
||||
prefix `[RELEASE-0.Y] Your PR Title` to clearly designate this PR as targeting
|
||||
the release branch. A lead will review and make a ruling on the PR, but if
|
||||
this consideration was front-loaded, it should be a short review.
|
||||
|
||||
### Picking up fixes
|
||||
|
||||
Downstream repositories should reference `knative/pkg` release branches from
|
||||
their own release branches, so to update the `knative/pkg` dependency we run:
|
||||
|
||||
```shell
|
||||
dep ensure -update github.com/knative/pkg
|
||||
./hack/update-deps.sh
|
||||
```
|
Loading…
Reference in New Issue