From 39c004737b4cd86da696231aa55c4d8eabb11994 Mon Sep 17 00:00:00 2001 From: Brian Grant Date: Wed, 22 Jul 2015 20:16:41 +0000 Subject: [PATCH] Update post-1.0 release versioning proposal. --- versioning.md | 13 ++++++------- 1 file changed, 6 insertions(+), 7 deletions(-) diff --git a/versioning.md b/versioning.md index 8a5472424..5d1cec0e4 100644 --- a/versioning.md +++ b/versioning.md @@ -40,14 +40,13 @@ Legend: ## Release Timeline -### Minor version timeline +### Minor version scheme and timeline -* Kube 1.0.0 -* Kube 1.0.x: We create a 1.0-patch branch and backport critical bugs and security issues to it. Patch releases occur as needed. -* Kube 1.1-alpha1: Cut from HEAD, smoke tested and released two weeks after Kube 1.0's release. Roughly every two weeks a new alpha is released from HEAD. The timeline is flexible; for example, if there is a critical bugfix, a new alpha can be released ahead of schedule. (This applies to the beta and rc releases as well.) -* Kube 1.1-beta1: When HEAD is feature complete, we create a 1.1-snapshot branch and release it as a beta. (The 1.1-snapshot branch may be created earlier if something that definitely won't be in 1.1 needs to be merged to HEAD.) This should occur 6-8 weeks after Kube 1.0. Development continues at HEAD and only fixes are backported to 1.1-snapshot. -* Kube 1.1-rc1: Released from 1.1-snapshot when it is considered stable and ready for testing. Most users should be able to upgrade to this version in production. -* Kube 1.1: Final release. Should occur between 3 and 4 months after 1.0. +* Kube 1.0.0, 1.0.1 -- DONE! +* Kube 1.0.X (X>1): Standard operating procedure. We patch the release-1.0 branch as needed and increment the patch number. +* Kube 1.1alpha.X: Released roughly every two weeks by cutting from HEAD. No cherrypick releases. If there is a critical bugfix, a new release from HEAD can be created ahead of schedule. (This applies to the beta releases as well.) +* Kube 1.1beta.X: When HEAD is feature-complete, we go into code freeze 2 weeks prior to the desired 1.1.0 date and only merge PRs essential to 1.1. Releases continue to be cut from HEAD until we're essentially done. +* Kube 1.1.0: Final release. Should occur between 3 and 4 months after 1.0. ### Major version timeline