Boulder Release Process

A description and demonstration of the full process for tagging a normal weekly release, a "clean" hotfix release, and a "dirty" hotfix release.

Once a release is tagged, it will be generally deployed to staging and then to production over the next few days.

Goals

  1. All development, including reverts and hotfixes needed to patch a broken release, happens on the main branch of this repository. Code is never deployed without being reviewed and merged here first, and code is never landed on a release branch that isn't landed on main first.

  2. Doing a normal release requires approximately zero thought. It Just Works.

  3. Doing a hotfix release differs as little as possible from the normal release process.

Release Schedule

Boulder developers make a new release at the beginning of each week, typically around 10am PST Monday. Operations deploys the new release to the staging environment on Tuesday, typically by 2pm PST. If there have been no issues discovered with the release from its time in staging, then on Thursday the operations team deploys the release to the production environment.

Holidays, unexpected bugs, and other resource constraints may affect the above schedule and result in staging or production updates being skipped. It should be considered a guideline for normal releases but not a strict contract.

Release Structure

All releases are tagged with a tag of the form release-YYYY-MM-DD[x], where the YYYY-MM-DD is the date that the initial release is cut (usually the Monday of the current week), and the [x] is an optional lowercase letter suffix indicating that the release is an incremental hotfix release. For example, the second hotfix release (i.e. third release overall) in the third week of January 2022 was release-2022-01-18b.

All release tags are signed with a key associated with a Boulder developer. Tag signatures are automatically verified by GitHub using the public keys that developer has uploaded, and are additionally checked before being built and deployed to our staging and production environments. Note that, due to how Git works, in order for a tag to be signed it must also have a message; we set the tag message to just be a slightly more readable version of the tag name.

Making a Release

Prerequisites

Regular Releases

Simply create a signed tag whose name and message both include the date that the release is being tagged (not the date that the release is expected to be deployed):

git tag -s -m "Boulder release $(date +%F)" -s "release-$(date +%F)"
git push origin "release-$(date +%F)"

Clean Hotfix Releases

If a hotfix release is necessary, and the desired hotfix commits are the only commits which have landed on main since the initial release was cut (i.e. there are not any commits on main which we want to exclude from the hotfix release), then the hotfix tag can be created much like a normal release tag.

If it is still the same day as an already-tagged release, increment the letter suffix of the tag:

git tag -s -m "Boulder hotfix release $(date +%F)a" -s "release-$(date +%F)a"
git push origin "release-$(date +%F)a"

If it is a new day, simply follow the regular release process above.

Dirty Hotfix Release

If a hotfix release is necessary, but main already contains both commits that we do and commits that we do not want to include in the hotfix release, then we must go back and create a release branch for just the desired commits to be cherry-picked to. Then, all subsequent hotfix releases will be tagged on this branch.

The commands below assume that it is still the same day as the original release tag was created (hence the use of "date +%F"), but this may not always be the case. The rule is that the date in the release branch name should be identical to the date in the original release tag. Similarly, this may not be the first hotfix release; the rule is that the letter suffix should increment (e.g. "b", "c", etc.) for each hotfix release with the same date.

git checkout -b "release-branch-$(date +%F)" "release-$(date +%F)"
git cherry-pick baddecaf
git tag -s -m "Boulder hotfix release $(date +%F)a" "release-$(date +%F)a"
git push origin "release-branch-$(date +%F)" "release-$(date +%F)a"

Deploying Releases

When doing a release, SRE's tooling will check that:

  1. GitHub shows that tests have passed for the commit at the planned release tag.

  2. The planned release tag is an ancestor of the current main on GitHub, or the planned release tag is equal to the head of a branch named release-branch-XXX, and all commits between main and the head of that branch are cherry-picks of commits which landed on main following the normal review process.